We are entering the final week of construction on our house. This week hardware, the kitchen, final landscaping, touch-up painting and glass infill at the screen units will be done. Week after next will be cleaning. Here are some updated pictures:

IMG_4561

Doors from the dining room to the screen porch

Doors from the dining room to the screen porch

10 foot doors in Lea's studio

10 foot doors in Lea’s studio

Doors from the library to the dining room

Doors from the library to the dining room

Door to guest bedroom

Door to guest bedroom

Library wall

Library wall

Looking south from the library to the main entrance

Looking south from the library to the main entrance

Looking southeast from the bedroom

Looking southeast from the bedroom

Ciricote tree

Ciricote tree

Interior of Master Bedroom

Interior of Master Bedroom

Air Gill Stair

Air Gill Stair

Jeff's Studio Overhang

Jeff’s Studio Overhang

Air channel corridor

Air channel corridor

West wall of Jeff's studio

West wall of Jeff’s studio

Cieba tree

Cieba tree

The north windows to Lea's studio

The north windows to Lea’s studio

Detail of the mandivilla plant system.

Detail of the mandivilla plant system.

Air-Gill Stair

Air-Gill Stair

Bedroom garden with the neem tree and our fountain.

Bedroom garden with the neem tree and our fountain.

View to the east from the bedroom garden

View to the east from the bedroom garden

View of the "air gill" cantilevered stair.

View of the “air gill” cantilevered stair.

View of the wire system for the mandivilla plants.

View of the wire system for the mandivilla plants.

View looking north along the lap pool towards Lea's Studio.

View looking north along the lap pool towards Lea’s Studio.

Momposteria wall

Momposteria wall

Pin It on Pinterest

Shares
Share This